Project Short Description
The Noor Abad wastewater treatment project in capacity of 24400 m3/h has been designed and constructed in 2km of Noor Abad town of Mamasani province and 180 km from Shiraz main city. The plant serves the population of 125000 person in active wastewater method of A2O type (MLE) and wide depth aeration. The scope of contract was design, procurement, installation and commissioning of civil construction, mechanical, electrical, control, instrumentation, and six months tentative operation of the plant.